
VOLUME 3 - STANDARD DRAWINGS
Return to Home Page
Return to Volume
3 Table of Contents
WA-01 50mm (2") Manual Air Valve (11-3-2006)
WA-02 50mm (2") Automatic Combination Air Release and Air/Vacuum Valve Installations (11-3-2006)
WA-03 50mm (2") Air and Vacuum Valve Enclosure Locations (11-3-2006)
WA-04 100mm (4") Automatic Combination Air Release and Air/Vacuum Valve Installations (11-3-2006)
WA-05 150mm (6") Automatic Combination Air Release and Air/Vacuum Valve Installations (11-3-2006)
WA-06 100mm & 150mm (4" & 6") Air and Vacuum Valve Enclosure Locations (3-1-2001)
BLOWOFF DETAILS
WB-01 50mm (2") Blowoff Installation (12-31-2003)
WB-02 100mm (4") Blowoff Installation (11-3-2006)
WB-03 150mm (6") Blowoff Installation (11-3-2006)
WB-04 Blowoff Installation from End of Mains and from Steel Mains (3-1-2001)
WB-05 Temporary 50mm (2") Blowoff installation (12-31-2004)
CATHODIC PROTECTION DETAILS
WC-01 Exothermic Weld Detail (3-1-2001)
WC-02 Rubber-Ring Joint Bonding Detail for Metallic Pipelines (3-1-2001)
WC-03 Buried Mechanical Joint Bonding Detail for Metallic Pipelines (3-1-2001)
WC-04 Above Ground Insulating Flange (3-1-2001)
WC-05 Buried Insulating Flange Detail (3-1-2001)
WC-06 Buried Insulating Flange Test Station Wiring Diagram (7-30-2007)
WC-07 Buried Insulated Valve Detail (7-30-2007)
WC-08 Buried Insulated Butterfly Valve Test Station Wiring Diagram (Eliminated 7-30-2007)
WC-09 Two Wire Test Station (3-1-2001)
WC-10 Casing Test Station (3-1-2001)
WC-11 Single Anode Installation Detail (3-1-2001)
WC-12 Prepackaged Magnesium Anode Detail (7-30-2007)
WC-13 Single Anode Test Station Wiring Diagram (7-30-2007)
WC-14 Cathodic Test Station Box (7-30-2007)
WC-15 Reference Electrode Installation Detail (3-1-2001)
WC-16 Prepackaged Reference Electrode Detail (3-1-2001)
WC-17 New Installation of Sacrificial Anodes for Copper Tubing (12-31-2003)
WC-18 Retrofit Installation of Sacrificial Anodes for Copper Tubing (12-31-2003)
FIRE HYDRANT AND FIRE SERVICE DETAILS
WF-01 150mm (6") Fire Hydrant Installation (11-1-2002)
WF-02 150mm (6") Fire Hydrant Installation with Break–Off Check Valve (7-30-2007)
WF-03 High Pressure Dry Barrel Fire Hydrant Installation (9-3-2001)
WF-04 Fire Hydrant Locations and Port Orientation (9-12-2008)
WF-05 100mm (4") and Larger Fire Service Installation (1 of 2) (9-12-2008)
100mm (4") and Larger Fire Service Installation Notes (2 of 2) (9-12-2008)
GENERAL WATER INFORMATION DETAILS
WI-01 Water, Recycled Water and Sewer Main Parallel Separations (3-1-2001)
WI-02 Water, Recycled Water and Sewer Main Perpendicular Separations (12-31-2003)
WI-03 Water, Recycled Water and Sewer Main Parallel and Perpendicular Separation Notes (3-1-2001)
WI-04 Post Meter Constant Pressure Recycled Water Line 75mm (3") Diameter or
Less Crossing Potable Water Main or Lateral within Public Right-of-Way (3-1-2001)WI-05 Allowable Leakage Chart for Testing of Pipes with Rubber Joints (9-3-2001)
WI-06 Standard Symbols for Potable and Recycled Water Construction Drawings (1 of 4) (12-31-2004)
Standard Symbols for Potable and Recycled Water Construction Drawings (2 of 4) (11-3-2006)
Standard Symbols for Potable and Recycled Water Construction Drawings (3 of 4) (12-31-2004)
Standard Symbols for Potable and Recycled Water Construction Drawings (4 of 4) (12-31-2004)
MISCELLANEOUS WATER DETAILS
WM-01 Water Test Station Installation (11-3-2006)
WM-02 Water Test Station Enclosure Locations (11-3-2006)
WM-03 Retaining Wall for Fire Hydrants and Water and Recycled Water Appurtenances (1 of 2) (9-12-2008)
Retaining Wall for Fire Hydrants and Water and Recycled Water Appurtenances (2 of 2) (9-12-2008)WM-04 Protection Post Installation (12-31-2004)
WM-05 Demountable Protection Post Installation (12-31-2004)
WM-06 Easement/Utility Marker Post Installation (12-31-2004)
WM-07 Replacement of Sewer Lateral Crossings (3-1-2001)
WM-08 Recycled Water "Do Not Drink" Sign (11-16-2007)
PIPELINE DETAILS
WP-01 Warning/Identification Tape and Tracer Wire Installations (12-31-2004)
WP-02 Pipe Bedding and Trench Backfill for Potable and Recycled Water Mains (7-30-2007)
WP-03 Cutting and Plugging Abandoned Water, Recycled Water and Sewer Mains (3-1-2001)
WP-04 Pipe Casing Installation (3-1-2001)
WP-05 Slope Protection Installations (7-30-2007)
WP-06 Pipe Protection Pad Installations (3-1-2001)
WP-07 Cut - Off Wall Installation in Traveled Areas (3-1-2001)
WP-08 Pipe Encasement for Existing Water Main at Utility Undercuts (9-3-2001)
WP-09 Pipe Support for Undercut Sewer Mains (11-1-2002)
BACKFLOW PREVENTION DETAILS
WR-01 19mm through 50mm (3/4” through 2”) Reduced Pressure Backflow Prevention Device (2-1-2008)
WR-02 75mm (3") and Larger Reduced Pressure Backflow Prevention Device (2-1-2008)
![]()
WR-03 25mm and 50mm (1" and 2") Recycled Water Irrigation Check Valve Installation (11-16-2007)
WR-04 Recycled Water Irrigation Cross Connection Test Station (11-3-2006)
WR-05 Temporary Potable Water to Recycled Water Inter-Connection (3-1-2001)
WR-06 75mm (3") or Larger Recycled Water Irrigation Wye Strainer & Check Valve Installation (1 of 2) (9-12-2008) NEW
75mm (3") or Larger Recycled Water Irrigation Wye Strainer & Check Valve Installation (2 of 2) (9-12-2008) NEWWR-07 75mm (3") or Larger Recycled Water Irrigation Cross Connection Test Station (1 of 2) (9-12-2008) NEW
75mm (3") or Larger Recycled Water Irrigation Cross Connection Test Station (2 of 2) (9-12-2008) NEW
WATER SERVICE LATERAL DETAILS
WS-01 25mm (1") Water Service Installation (3-1-2001)
WS-02 50mm (2") Water Service Installation (12-31-2003)
WS-03 Meter Box Locations for Water and Recycled Water Appurtenances (12-31-2003)
WS-04 100mm (4") or 150mm (6") Fireline/Master Meter Installation (1 of 2) (3-1-2001)
100mm (4") or 150mm (6") Fireline/Master Meter Installation (2 of 2) (11-3-2006)WS-05 100mm (4") or 150mm (6") Meter Installation (1 of 2) (11-3-2006)
100mm (4") or 150mm (6") Meter Installation (2 of 2) (11-3-2006)WS-06 Vault Locations for 100mm (4") and Larger Water Services (3-1-2001)
WS-07 Existing Water Service Assembly Reconnection (3-1-2001)
WS-08 Existing Water Service Abandonment (3-1-2001)
WS-09 25mm (1") Duel Domestic/Fire Water Service Installation (11-16-2007)
THRUST AND ANCHOR BLOCKS AND PIPE RESTRAINT DETAILS
WT-01 Concrete Thrust and Anchor Block Installations (1 of 3) (11-16-2007)
Concrete Thrust and Anchor Block Installations (2 of 3) (11-16-2007)
Concrete Thrust and Anchor Block Installations (3 of 3) (11-1-2002)WT-02 Valve Support Blocks (11-16-2007) NEW
VALVE DETAILS
WV-01 Gate Well Installation for Valves in Areas where Speed Limit is less than 56km/h (35mph) (12-31-2003)
WV-02 Gate Well Installation for Valves in Areas where Speed Limit is 56 km/h (35mph) or Greater (11-1-2002)
WV-03 Gate Well Identification (11-16-2007)
WV-04 Steel Valve Stem Extension for Valves 100mm (4") and Larger (3-1-2001)
WV-05 Steel Valve Stem Extension for Valves 50mm (2") and Smaller (7-30-2007)