CLEANOUT DETAILS

SC-01      Sewer Main Cleanout for 150mm (6") and 200mm (8") Mains (11-23-2011)

 

 

SEWER INFORMATION

SI-01        Standard Symbols for Sewer Construction Drawings (11-23-2011)

 

MANHOLE DETAILS

SM-01        1500mm (60") Diameter Precast Manhole Installation (3-1-2001)

SM-02        1500mm (60") Diameter Shallow Precast Manhole Installation (3-1-2001)  

SM-03        1500mm (60") Diameter Manhole Bases (12-31-2003)  

SM-04        Manhole Pipe Connectors (3-1-2001)

SM-05        Manhole Access Locations and Stub Out and Joint Details (3-1-2001)

SM-06        900mm (36") Manhole Frame and Two Concentric Covers (3-1-2001)

SM-07        Manhole Coating and Lining System (3-1-2001)

SM-08        Existing Manhole Abandonment (3-1-2001)

SM-09        1500mm (60") Diameter Drop Manhole for Sewer Mains (3-1-2001)

SM-10        1500mm (60") Diameter Drop Manhole Sections, Details and Notes (3-1-2001)

SM-11        Locking Manhole Cover (3-1-2001)

 

PIPELINE DETAILS

        SP-01        Warning/Identification Tape Installation (3-1-2001)

        SP-02        Pipe Bedding and trench Backfill for Sewer Facilities (11-1-2002)

        SP-03        Concrete Pipe Cradle (3-1-2001)

 

SEWER SERVICE LATERAL DETAILS

        SS-01        100mm (4") and 150mm (6") Sewer Lateral Installation (11-23-2011)

        SS-02        100mm (4") and 150mm (6") Deep-Cut Sewer Lateral Installation (11-23-2011)

        SS-03        Sewer Lateral Notes and Details (11-23-2011)

        SS-04        100mm (4") and 150mm (6") Sewer Cut-in Wye Connections (11-23-2011)