INTRODUCTION
- WADG Binder Cover
(2-1-2008) NEW
- WADG Binder End Sheet
(2-1-2008) NEW
- Table of Contents
(2-1-2008)

- Introduction
(2-1-2008)

- Signatory Agencies
(2-1-2008)

- Technical Review
(9-7-2004)
- Standard Terms and Definitions
(9-7-2004)
SECTION 1.0
GENERAL
- 1.1
Drafting Guidelines
(9-7-2004)
- 1.2
AutoCAD Guidelines
(9-7-2004)
- 1.3
Microstation Guidelines
(Future Release)
- 1.4
Land Acquisition and Disposition
(5-2-2006)
- 1.5
Easements and Encroachments
(9-7-2004)
- 1.6
Survey Standards Guideline
(9-7-2004)
- 1.7
Record Drawing Guidelines
(9-7-2004)
SECTION 2.0
PRIVATE DEVELOPMENT PROJECTS
- 2.1
Procedural Guidelines
(9-7-2004)
- 2.2
Development Plan and Permit Processing Procedures
(9-7-2004)
- 2.3
Water Facility Guidelines
(9-7-2004)
- 2.4
Sewer Facility Guidelines
(9-7-2004)
- 2.5
Recycled Water Facility Guidelines
(9-7-2004)
SECTION 3.0
AGENCY IMPROVEMENT PROJECTS
- 3.1
Agency Capital Improvement Projects
(9-7-2004)
- 3.2
Design Project Progress Submittals
(9-7-2004)
- 3.3
Submittals (Shop)
(9-7-2004)
- 3.4
Project Cost Estimates
(5-2-2006)
- 3.5
Technical Specifications
(9-7-2004)
SECTION 4.0
PLANNING
- 4.1
Water Planning
(9-7-2004)
- 4.2
Sewer Planning
(9-7-2004)
- 4.3
Recycled Water Planning
(9-7-2004)
- 4.4
Sub-Area Master Plan Development
(9-7-2004)
- 4.5
Environmental Review
(9-7-2004)
- 4.6
National Pollutant Elimination System (NPDES)
(9-7-2004)
- 4.7
Other Agency Permits
(5-2-2006)
SECTION 5.0
WATER PIPELINE DESIGN
- 5.1
Pressure Pipeline Design
(9-7-2004)
- 5.2
Thrust Restraint and Anchor Blocks
(9-26-2007)

- 5.3
Line Valves Selection and Placement
(9-26-2007)

- 5.4
Fire Hydrant and Fire Services
(9-7-2004)
- 5.5
Air Valves
(9-7-2004)
- 5.6
Blowoffs (9-7-2004)
- 5.7
Water Services and Test Stations
(9-7-2004)
SECTION 6.0
SEWER PIPELINE DESIGN
- 6.1
Gravity Sewer Pipeline Design
(9-7-2004)
- 6.2
Sewer Manholes and Cleanouts
(9-7-2004)
- 6.3
Sewer Laterals
(9-7-2004)
- 6.4
Pressure Systems (Force Mains)
(5-2-2006)
SECTION 7.0
RESERVOIR DESIGN
- 7.1
Storage Facilities
(5-2-2006)
- 7.2
Seismic Sensing Devices
(Future Release)
SECTION 8.0
PRESSURE/FLOW CONTROL STATIONS
- 8.1
Pressure/Flow Control Stations
(5-2-2006)
SECTION 9.0
WATER PUMP STATION DESIGN
- 9.1
Water Pump Station Design
(5-1-2007)
NEW
- 9.2
Structural Guidelines
(5-1-2007)
NEW
- 9.3
Noise Control Guidelines
(5-1-2007)
NEW
SECTION 10.0
SEWAGE PUMP STATION DESIGN
- 10.1
Sewage Pump (Lift) Station Design
(2-1-2008)
NEW
- 10.2
Surge Control/Analysis
(2-1-2008)
NEW
SECTION 11.0
CORROSION CONTROL
- 11.1
Pipeline Corrosion Control Systems
(2-1-2008)
NEW
- 11.2
Reservoir Corrosion Control Systems
(2-1-2008)
NEW
SECTION 12.0
SPECIALIZED DESIGN
- 12.1
Bridge Crossings
(5-2-2006)
- 12.2
Trenchless Construction
(5-2-2006)
- 12.3
Pipe Bursting
(5-2-2006)
- 12.4
Railroad and Freeway Construction
(5-2-2006)
- 12.5
Pipeline Rehabilitation (5-1-2007)
NEW
- 12.6
Temporary Above Ground Piping (Water)
(5-2-2006)
- 12.7
Temporary By-pass Requirements (Sewer)
(5-2-2006)
- 12.8
Facility Security Guidelines
(Future Release)
SECTION 13.0
APPENDIX